Your buyer's home inspector will check the roof, the water heater, the panel box, maybe the crawl space if they're thorough. None of that determines whether you can close on time in Morgan Hill. A separate inspection does, one your buyer never orders and your agent can't waive: a city-mandated camera inspection of the pipe running from your house to the street.
Morgan Hill is one of the only cities in this part of Silicon Valley that requires it. Los Gatos and Saratoga do not. San Jose splits the responsibility between homeowner and city. Morgan Hill puts the entire line, and the entire bill if something's wrong, on the seller.
Here's the part most sellers get wrong before they even list: they assume this is a rule for old houses. It isn't. It's a rule that eventually reaches every house in Morgan Hill, including the one being framed on Cochrane Avenue right now.
The requirement actually comes from two separate city ordinances that took effect June 1, 2022, and they don't run on the same schedule.
Ordinance No. 2322 requires a closed-circuit TV inspection of your private sewer lateral, the pipe carrying wastewater from your house to the city's main line, before the sale can close. It applies to any property more than 15 years old. Because that threshold is measured from today's date, not a fixed year, it moves every January. As of 2026, a home built in 2011 or later is exempt. Anything built in 2010 or earlier needs the inspection.
Ordinance No. 2323 requires a separate inspection of your toilets, showerheads, and urinals, with anything predating 1993 swapped for high-efficiency fixtures. This one doesn't move. It applies to any home built before January 1, 1994, full stop.
One clock rolls forward every year. The other is fixed in place. That difference is the whole story.
| Approximate Build Year | Sewer Lateral (PSL) Inspection | Plumbing Fixture Retrofit |
|---|---|---|
| Before 1994 | Required | Required |
| 1994 to 2010 | Required | Not required |
| 2011 or later | Not required, for now | Not required |
A home in the 1994-to-2010 band, plenty of Morgan Hill's 1990s and early-2000s construction falls here, skips the fixture retrofit but still owes the city a passing sewer camera report. Only homes built within roughly the last 15 years are clear on both counts, and that clearance has an expiration date. A house finished in 2015 is exempt from the PSL inspection today. It will not be exempt in 2030, when it crosses the same 15-year line every older house in town already crossed. There is no permanent opt-out here, only a temporary one that a rolling calendar quietly closes.
Age isn't evenly distributed across Morgan Hill, so neither is exposure to this rule.
Downtown, along Third Street and Monterey Road, some homes date to the 1940s and 1950s. Sellers there are almost certainly looking at both inspections. Jackson Oaks, the established eastside hillside neighborhood that traces back to 1971, sits in the same position. Holiday Lake Estates is more mixed, with homes built anywhere from the 1970s through the late 1990s and a handful newer, which means the fixture retrofit may or may not apply depending on the specific house, but the sewer lateral inspection almost certainly does.
The newer construction west of 101, along Cochrane and toward Diana Avenue, is where the last decade of Morgan Hill's growth has concentrated. Sellers there are more likely to file an exemption form than a passing inspection report. For now.
A qualified contractor, meaning a state-licensed plumber who also holds a Morgan Hill business license and NASSCO certification, runs the camera from the cleanout to the street connection and files the report with the city. If it passes, the city issues a Certificate of Compliance within five business days and you move on. If it fails, you have two paths.
The first is to fix it before closing. Any licensed plumber with a Morgan Hill business license can do the repair work itself, the NASSCO certification is only required for the inspection and the follow-up verification, not the repair. Once the fix is done, the same qualified contractor re-inspects, and a new report goes to the city.
The second path is a Transfer of Responsibility. Seller and buyer notarize a form agreeing the buyer will complete the repair after closing, and the city gives the buyer 180 days from the date water service is turned on to finish the work and submit a passing report. This keeps the deal moving, but it requires both sides to agree, and it means the defect follows the property into the buyer's hands with a clock already running.
Neither path is automatic. The city's own guidance to sellers is blunt about the first step: call a few qualified contractors and get quotes before you commit to one, because pricing varies by contractor and by how accessible your cleanout is. National pricing guides for CCTV sewer camera inspections generally land somewhere between $150 and $750, with the low end reserved for homes with an easy-access cleanout and the high end for jobs where a toilet has to come out to get the camera in. Repair costs sit entirely outside that range and depend on what the camera actually finds.
If you've sold in Los Gatos or Saratoga before, none of this will feel familiar, because neither city requires a sewer lateral inspection at the point of sale. That's not an oversight. It reflects a different set of infrastructure priorities. Morgan Hill adopted these ordinances specifically to cut down on stormwater intrusion into its sewer system and to reduce water use ahead of future supply planning, goals tied to the city's own pipe network and water conservation targets, not a countywide standard.
San Jose takes a third approach entirely. There, the city is responsible for the lower portion of the lateral and the homeowner only owns the upper portion. Morgan Hill draws no such line. The entire pipe, from the house to the main, is the seller's responsibility, and the entire cost of getting it compliant is the seller's to plan for.
If you're comparing a move between Morgan Hill and one of DBREG's other core markets, this is worth building into your timeline math from the start, not discovering it after you've already accepted an offer.
Does this apply if I have a septic system instead of city sewer? No. Properties connected to a separate septic system, rather than the city's sewer main, are exempt from the PSL inspection, though you'll still need to file the exemption paperwork.
Can I skip the inspection if my house is brand new? You still need to file for the exemption formally, even if your home clearly qualifies. The city wants the paperwork on record either way, so the buyer has documentation at closing.
What if I already replaced my sewer lateral a few years ago? If it was inspected and met city standards within the last 10 years, or fully replaced within the last 15, you can apply for an exemption rather than repeating the CCTV inspection from scratch.
None of this is complicated once you know it's coming. The problem is timing: sellers who learn about a failed inspection three weeks before their scheduled closing are negotiating from a much weaker position than sellers who ordered the CCTV inspection before they ever listed.
That's the kind of sequencing we build into every Morgan Hill listing timeline at Diane Bucher Real Estate Group, the same disciplined, checklist-driven approach Diane brought from a career managing corporate projects before real estate. A sewer lateral inspection is a small line item on a pre-listing checklist. It's a much bigger problem when it shows up as a surprise during escrow.
If you're weighing a sale in Morgan Hill, or comparing what a move there versus Los Gatos or Saratoga would actually require, request your personalized home valuation and we'll walk through exactly what your specific address is likely to owe the city before it ever hits the market.